Laserfiche WebLink
TABLE 17 <br />RUM RIVER HILLS GOLF CLUB <br />HOLE #15 SATURATION - CREEK LINING AND DRAIN TILE <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $350.00 1 $350 <br />2 4" PERF PIPE ❑RAIN LIN FT $15.00 450 $6,750 <br />3 CREEK LINING LUMP SUM $5,000.00 1 $5,000 <br />4 TURF ESTABLISHMENT LUMP SUM $200.00 1 $200 <br />Estimated Construction Cost $12,300 <br />Contingency (10%) $1,230 <br />Total Estimated Construction Cost $13,530 <br />