Laserfiche WebLink
ITEM <br />NO. <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />TABLE 18 <br />RUM RIVER HILLS GOLF CLUB <br />FLOODING AROUND HOLE #3 AND #17 - NEW CULVERTS <br />DESCRIPTION <br />MOBILIZATION <br />REMOVE STORM SEWER <br />21" METAL APRON <br />24" METAL APRON <br />24" CP PIPE CULVERT <br />24" CP PIPE CULVERT <br />TURF ESTABLISHMENT <br />UNIT <br />LUMP SUM <br />LIN FT <br />EACH <br />EACH <br />LIN FT <br />LIN FT <br />LUMP SUM <br />UNIT <br />COST <br />$200.00 <br />$4.00 <br />$300.00 <br />$325.00 <br />$26.00 <br />$27.00 <br />$300.00 <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />1 <br />72 <br />4 <br />2 <br />46 <br />26 <br />1 <br />Estimated Construction Cost <br />Contingency (1O%) <br />Total Estimated Construction Cost <br />TOTAL <br />ESTIMATED <br />COST <br />$200 <br />$288 <br />$1,200 <br />$650 <br />$1,196 <br />$702 <br />$300 <br />$4, 536 <br />$454 <br />$4,990 <br />