Laserfiche WebLink
TABLE 3 <br />148TH LANE <br />ALTERNATIVE 1C - 24" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. ❑ESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $1,300.00 1 $1,300 <br />2 CLEARING TREE $100.00 12 $1,200 <br />3 GRUBBING TREE $100.00 12 $1,200 <br />4 REMOVE STORM SEWER LIN FT $4.00 388 $1,552 <br />5 REMOVE CONCRETE CURB LIN FT $5.00 155 $775 <br />6 REMOVE BITUMINOUS PAVEMENT SQ YD $5.00 195 $975 <br />7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT $3.00 175 $525 <br />8 4" AGGREGATE BASE CLASS 5 SQ YD $7.50 195 $1,463 <br />9 4" BITUMINOUS PATCH SQ YD $28.00 195 $5,460 <br />10 BULKHEAD MANHOLE EACH $500.00 1 $500 <br />11 24" RC PIPE APRON EACH $450.00 2 $900 <br />12 TRASH GUARD FOR 24" PIPE APRON EACH $300.00 2 $600 <br />13 CONNECT TO EXISTING STORM SEWER EACH $1,000.00 1 $1,000 <br />14 24" RC PIPE SEWER DESIGN 3006, CL III LIN FT $29.00 414 $12,006 <br />15 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 - 4020 EACH $1,500.00 1 $1,500 <br />16 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 - 4020 LIN FT $2,000,00 2 $4,000 <br />17 CONCRETE CURB & GUTTER DESIGN B618 LIN FT $20.00 155 $3,100 <br />18 TRAFFIC CONTROL LUMP SUM $500.00 1 $500 <br />19 CONIFEROUS TREE 4' HT B&B TREE $200.00 12 $2,400 <br />20 TURF ESTABLISHMENT ACRE $1,500.00 0.2 $300 <br />Estimated Construction Cost $41,256 <br />Contingency (10%) $4,126 <br />Total Estimated Construction Cost $45,381 <br />