Laserfiche WebLink
TABLE 4 <br />148TH LANE <br />ALTERNATIVE 2A - 15" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATE❑ <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $400.00 1 $400 <br />2 CLEARING TREE $100.00 2 $200 <br />3 GRUBBING TREE $100.00 2 $200 <br />4 REMOVE STORM SEWER LIN FT $5.00 118 $590 <br />5 REMOVE CONCRETE CURB LIN FT $10.00 20 $200 <br />6 REMOVE BITUMINOUS PAVEMENT SQ Y❑ $5.00 23 $115 <br />7 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT $3.00 40 $120 <br />8 COMMON EXCAVATION CU YD $5.00 100 $500 <br />9 4" AGGREGATE BASE CLASS 5 SO YD $7.50 23 $173 <br />10 4" BITUMINOUS PATCH SQ YD $28.00 23 $644 <br />11 BULKHEAD MANHOLE EACH $500.00 1 $500 <br />12 15" RC PIPE APRON EACH $300.00 1 $300 <br />13 TRASH GUAR❑ FOR 15" PIPE APRON EACH $150.00 1 $150 <br />14 CONNECT TO EXISTING STORM SEWER EACH $1,000.00 1 $1,000 <br />15 15" RC PIPE SEWER DESIGN 3006, CL V LIN FT $22.00 152 $3,344 <br />16 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 4020 EACH $1,500.00 1 $1,500 <br />17 CONCRETE CURB & GUTTER DESIGN B618 LIN FT $20.00 20 $400 <br />18 TRAFFIC CONTROL LUMP SUM $300.00 1 $300 <br />19 CONIFEROUS TREE 4' HT B&B TREE $200.00 2 $400 <br />20 TURF ESTABLISHMENT ACRE $1,500.00 0.1 $150 <br />Estimated Construction Cost $11,186 <br />Contingency (10°70) $1,119 <br />Permanent Easement ($1.15/ sq ft) $794 <br />Total Estimated Construction Cost $13,098 <br />