Laserfiche WebLink
TABLE 17 <br />RUM RIVER HILLS GOLF CLUB <br />HOLE #15 SATURATION - CREEK LINING AND DRAIN TILE <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />_ <br />$350.00 <br />1 <br />$350 <br />2 <br />4" PERF PIPE DRAIN <br />LIN FT <br />$15.00 <br />v 450 <br />$6,750 <br />3 <br />CREEK LINING <br />LUMP SUM <br />$5,000.00 <br />1 <br />$5,000 <br />4 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />$200.00 <br />1 <br />$200 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$12,300 <br />$1,230 <br />$13,530 <br />