My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/21/2012
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2012
>
Agenda - Public Works Committee - 02/21/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:19:47 AM
Creation date
5/11/2012 4:13:14 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/21/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 18 <br />RUM RIVER HILLS GOLF CLUB <br />FLOODING AROUND HOLE #3 AND #17 - NEW CULVERTS <br />ITEM <br />NO. <br />{ <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$200.00 <br />I <br />$200 <br />2 <br />REMOVE STORM SEWER <br />LIN FT <br />$4.00 <br />_ <br />72 <br />$288 <br />3 <br />21" METAL APRON <br />EACH <br />$300.00 <br />4 <br />$1,200 <br />4 <br />24" METAL APRON <br />EACH <br />$325.00 <br />2 <br />$650 <br />5 <br />24" CP PIPE CULVERT <br />LIN FT <br />$26.00 <br />46 <br />$1,196 <br />6 <br />24" CP PIPE CULVERT <br />LIN FT <br />$27.00 <br />26 <br />$702 <br />7 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />$300.00 <br />1 <br />$300 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$4,536 <br />$454 <br />$4,990 <br />
The URL can be used to link to this page
Your browser does not support the video tag.