Laserfiche WebLink
TABLE 20 <br />163RD LANE <br />ALTERNATIVE 1 B - 15" OUTLET <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATEā‘ <br />COST <br />1 <br />MOBILIZATION <br />LUMP SUM <br />$2,000.00 <br />1 <br />$2,000 <br />2 <br />COMMON EXCAVATION <br />CU YD <br />$5.00 <br />100 <br />$500 <br />3 <br />_ <br />15" METAL APRON <br />EACH <br />$225.00 <br />2 <br />$450 <br />4 <br />15" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) <br />L1N FT <br />$92.00 <br />700 <br />$64,400 <br />5 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />_ <br />$200.00 <br />1 <br />$200 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$67,550 <br />$6,755 <br />$74,305 <br />