Laserfiche WebLink
TABLE 21 <br />163R❑ LANE <br />ALTERNATIVE IC - 18" OUTLET <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />UNIT <br />COST <br />TOTAL <br />ESTIMATED <br />QUANTITY <br />TOTAL <br />ESTIMATED <br />COST <br />1 <br />MOBILIZATION <br />~ LUMP SUM <br />$2,200.00 <br />1 <br />$2,200 <br />2 <br />COMMON EXCAVATION <br />CU YD <br />$5.00 <br />100 <br />$500 <br />3 <br />18" METAL APRON <br />EACH <br />$275.00 <br />2 <br />$550 <br />4 <br />18" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) <br />_ <br />LIN FT <br />$100.00 <br />700 <br />$70,000 <br />5 <br />TURF ESTABLISHMENT <br />LUMP SUM <br />_ <br />$200.00 <br />1 <br />$200 <br />Estimated Construction Cost <br />Contingency (10%) <br />Total Estimated Construction Cost <br />$73,450 <br />$7,345 <br />$80,795 <br />