Laserfiche WebLink
TABLE 19 <br />163RD LANE <br />ALTERNATIVE 1A - 12" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $1,800.00 1 $1,800 <br />2 COMMON EXCAVATION CU YD $5.00 100 $500 <br />3 12" METAL APRON EACH $200.00 2 $400 <br />4 12" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) LIN FT $85.00 700 $59,500 <br />5 TURF ESTABLISHMENT LUMP SUM $200.00 1 $200 <br />Estimated Construction Cost $62,400 <br />Contingency (10%) $6,240 <br />Total Estimated Construction Cost $68,640 <br />