Laserfiche WebLink
TABLE 20 <br />163RD LANE <br />ALTERNATIVE 1 B - 15" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $2,000.00 1 $2,000 <br />2 COMMON EXCAVATION CU YD $5.00 100 $500 <br />3 15" METAL APRON EACH $225.00 2 $450 <br />4 15" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) LIN FT $92.00 700 $64,400 <br />5 TURF ESTABLISHMENT LUMP SUM $200.00 1 $200 <br />Estimated Construction Cost $67,550 <br />Contingency (10%) $6,755 <br />Total Estimated Construction Cost $74,305 <br />