Laserfiche WebLink
TABLE 21 <br />163RD LANE <br />ALTERNATIVE 1C - 18" OUTLET <br />TOTAL TOTAL <br />ITEM UNIT ESTIMATED ESTIMATED <br />NO. DESCRIPTION UNIT COST QUANTITY COST <br />1 MOBILIZATION LUMP SUM $2,200.00 1 $2,200 <br />2 COMMON EXCAVATION CU YD $5.00 100 $500 <br />3 18" METAL APRON EACH $275.00 2 $550 <br />4 18" HDPE PIPE SEWER (DIRECTIONALLY DRILLED) LIN FT $100.00 700 $70,000 <br />5 TURF ESTABLISHMENT LUMP SUM $200.00 1 $200 <br />Estimated Construction Cost $73,450 <br />Contingency (10%) $7,345 <br />Total Estimated Construction Cost $80,795 <br />