Laserfiche WebLink
If No, Why Not? <br />I <br />Are Infiltration Basins proposed for project? <br />oN <br />SSA <br />Infiltration Basins <br />Was the infiltration rate of the soils at the proposed infiltration basin <br />measured /tested? <br />Was a soil boring conducted at all proposed infiltration basin? <br />Using the Unified Soil Classification System, what is the classification of the least <br />permeable soil layer at the proposed infiltration basin? (please fill in) <br />What is the hydrologic group classification of the soil at the proposed infiltration <br />basin? (please fill in) <br />Is the base of the infiltration basin at least at 3 feet above bedrock and the water <br />table, or an impermeable layer? <br />What is the depth to bedrock from the bottom of the proposed infiltration basin? <br />(please fill in) <br />Is the basin proposed to be planted with deep- rooted vegetation? J <br />Is the basin designed to treat the LRRWMO- required runoff volume and to infiltrate <br />the stormwater within 48 hours? <br />Is the basin set back at least 10 feet from all property lines? <br />Is the basin set back at least 10 feet from building foundations? <br />Is the basin set back at least 50 feet from private wells /public water wells? <br />Is the basin set back at least 35 feet from septic systems? <br />What is the drainage area to the infiltration basin? (please fill in) <br />For infiltration basins with drainage areas less than 2 acres, will at least 50% of the <br />inflow volume to the infiltration basin be pre - treated? <br />For infiltration basins with drainage areas greater than 2 acres, will all of the inflow <br />volume to the infiltration basin be pre - treated? <br />Will the proposed infiltration basin be staked off and marked during construction to <br />prevent compaction? <br />Who will maintain the infiltration basin? (please write the name and attach contact) <br />Lr, <br />Infiltration Basins <br />