Laserfiche WebLink
SURETY RATES FOR ACTIVITIES ASSOCIATED WITH LWWMO PERMITS <br />Performance Surety <br />The surety required by the LRRWMO will be used to ensure the performance and completion of <br />work in accordance with a permit. <br />Permit Activity Performance Surety Amount <br />Wetlands Management See Attachment C of Appendix B of the LRRWMO <br />Watershed Management Plan <br />Stormwater Management Facilities • Infiltration basins: $6 /sq ft. <br />• Rain gardens: $6 /sq ft. <br />• All other facilities: 125% of construction and <br />maintenance costs <br />Erosion and Sediment Control $2,500 /acre disturbed <br />Plus <br />$2.50 /linear foot of erosion control required <br />Shoreline or Streambank Improvements $5,000 or the total number of feet of shoreline of <br />streambank affected times $100 <br />SURETY MUST INCLUDE 10 PERCENT CONTINGENCY AND 30 PERCENT ADMINISTRATIVE COSTS <br />IN ADDITION TO AMOUNTS CALCULATED ACCORDING TO SCHEDULE ABOVE <br />MINIMUM SURETY AMOUNT (WHEN REQUIRED): $5,000 <br />P:1Mpls123 MN102123020471WorkFiles\Permit ChecklistlRequrdSuhmittalsExhibits .docx 4 <br />