My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 08/02/2012
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2012
>
Agenda - Planning Commission - 08/02/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:11:34 AM
Creation date
7/30/2012 11:17:22 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
08/02/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Wiser Choice Liquors <br />Site Plan Review <br />July 25, 2012 <br />Page 5 of 6 <br />sections. The method of adjusting the structures must be shown on the plans. There are also <br />water valve castings that will require adjustment. <br />• One of the existing water stubs at the building location is the supply for the existing irrigation <br />system in Sunwood Drive. A new connection must be provided as part of this project. <br />• New utility easements must extend from existing sanitary sewer line south to existing right of <br />way as there are inplace small utilities and new construction is not proposed in this area. The <br />utility easement shall be 20 feet north of the existing sanitary sewer line. <br />• There is and existing 21" storm sewer stub south of STRMCB #200 that does not pick up runoff. <br />It should be evaluated for removal and bulkheading at the structure. <br />The manhole details should be updated to include language for a water tight wrap around the adjusting <br />rings and include carsonite markers for any manhole or gate valve that is located in unpaved areas. <br />The following notes should be added or amended on the plan set: <br />• Any impacts to City streets (wet tap and curb cut locations) should be brought to grade with class <br />5 by the end of the work day and paved within 24 hours. <br />• The contractor shall have a sweeper on site or available within 3 hours. All material tracked onto <br />City streets must be removed immediately upon discovery, or as directed by the City Engineer. <br />• Installation of silt fence and other down gradient sediment protection measures shall be <br />completed and inspected prior to commencement of any site activities. <br />The City must review the dewatering plan for utility installation prior to implementation. No dewatering <br />activities can occur until the required permit is secured and submitted for review. <br />Street and Building Access: The site will derive access from shared access ways across the plat of COR <br />TWO. These accesses must be covered by access easements. The maintenance of these shared driveways <br />will be the responsibility of the adjacent property owners. There is a potential for conflict between trucks <br />accessing the area west of the building and traffic exiting lot 4. <br />Utilities: <br />• The size of storm sewers must be specified. <br />• All ductile iron watermain 6" in diameter and smaller shall be class 53 material. <br />• A water connection must be provided for the existing irrigation system along Sunwood Drive. <br />The connection must be located in a drainage and utility easement or right of way. <br />• The existing hydrant is proposed to be relocated. The watermain in this area is deeper than 7.5 <br />feet. An extension may be required. <br />All hydrants must be hand painted after installation. <br />There are existing small utilities crossing Lot 3, Block 1 COR TWO. The facility owners must be <br />notified of the need to move their facilities and the timeline for completion of the move. <br />Sidewalk and Trails. Sidewalks are being constructed along Sunwood Drive as part of the Sunwood <br />Drive Realignment Project. Due to the future reconstruction of Armstrong Boulevard, Staff recommends <br />that a trail not be constructed along Armstrong Boulevard at this time, to be constructed with the future <br />Armstrong Boulevard interchange. <br />
The URL can be used to link to this page
Your browser does not support the video tag.