Laserfiche WebLink
Craig J. Jochum, P.E. <br />Hakanson <br />Anderson <br />o 205th to 209th Avenue Service Road east Trunk Highway <br />65 <br />o 181st Avenue, Baltimore Street and Trunk Highway 65 <br />improvements <br />o Briarwood Lane and Trunk Highway 65 Service Road <br />o 187th Lane, Baltimore Street, 187th Avenue and Trunk <br />Highway 65 improvements and signal construction. <br />The above referenced projects also included acquiring Mn/DOT <br />Cooperative Agreement Grant Fund, feasibility reports, right-of-way <br />acquisition and wetland permitting. <br />• Develop Engineering Standards Manual used by developers for the <br />design and construction of City Public Improvement projects. <br />• Plat and construction plan review, development agreement <br />assistance and construction administration for numerous City <br />developments. <br />• Develop City Water Resource Management Plan and ordinances <br />for wetlands, buffers, groundwater and erosion control. <br />• Provide ongoing administration for the Municipal State Aid <br />Account. <br />City of Otsego <br />• Design Engineer and Project Manager for two, 1-million gallon <br />elevated water storage tanks. <br />• Design Engineer for two municipal water wells. <br />• Project Manager for Otsego Creek Restoration Project. <br />• Plat and construction plan review for City developments. <br />• Develop a comprehensive storm sewer plan for the west and east <br />sewer districts. <br />• Assist with the development of the Engineering Standards Manual <br />used by developers for the design and construction of City public <br />improvement projects. <br />Linwood and Hassan Township — Township Engineer <br />• Project Manager for the design and reconstruction of 237th Avenue <br />and Thames Street; Japura Street; and Township Park <br />Improvements. These projects also included right-of-way <br />acquisition, wetland permitting and development of a road access <br />district. <br />• Plat and construction plan review, development agreement <br />assistance, and construction administration for township <br />developments. <br />• Develop 5-year Road Maintenance Plan <br />• Prepare grant application to acquire Mn/DOT funding for the <br />replacement of the Hornsby Street Bridge. <br />• Northwest Hassan Pavement Study <br />• Reconstruction of Trail Haven Road <br />• Henry Woods Park Improvement <br />Page 2 of 2 <br />