My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Costs associated with word <br />processing, cell phones, <br />reproduction of common <br />correspondence and <br />mailing are included in <br />the hourly rates. Vehicle <br />mileage is normally <br />included in our billing <br />rates, but can be charged <br />separately if specifically <br />outlined by contract. <br />Reimbursable expenses <br />include costs associated <br />with plan, specification and <br />report reproduction, permit <br />fee, delivery cost, etc. <br />Rate schedule is <br />adjusted annually. <br />Each staff person is <br />assigned one billing rate <br />that is commensurate <br />with their experience and <br />expertise. Multiple rates <br />illustrate the varying levels <br />of experience within <br />each category. <br />Basis of Compensation <br />We will complete all of the general engineering activities discussed in this proposal, plus <br />other general duties Mr. Kellogg provides during office hours, as part of a lump -sum <br />fee in the amount of $6,500 per month (whether four or five days per week), totaling <br />$19,500 over the three-month term of the agreement. This term can be extended if the <br />need arises. <br />During the term of the contract, there may be a need for specific services outside the <br />above list that other staff at WSB would need to provide in support of Mr. Kellogg. If this <br />occurs, we will work with the City to determine a specific scope and fee arrangement <br />and provide the services our hourly standard rates. Examples could include: <br />• Stormwater management and MS4 • Construction services <br />NPDES requirements <br />• Preparation of engineering reports/ <br />• Miscellaneous surveying studies <br />If there are services required that fall outside of Mr. Kellogg's general services, such <br />as developer escrow -related services, we will provide the services at an hourly rate <br />according to our current fee schedule below and on file with the City as part of our <br />master contract. <br />2012 Billing Rate/Hour <br />Principal <br />Associate <br />Project Manager <br />Project Engineer <br />Graduate Engineer <br />Planner <br />Engineering Specialist <br />Engineering Technician <br />Scientist <br />Construction Observer <br />Coring Crew <br />One -Person Crew <br />Two -Person Crew <br />Survey Crew <br />One -Person Crew <br />Two -Person Crew <br />Three -Person Crew <br />Office Technician <br />Basis of Compensation <br />$137 <br />$128 <br />$107 I $114 I $121 <br />$94 I $99 I $107 I $114 I $121 <br />$79 I $84 I $89 <br />$72 <br />$89I$991$1071$114 <br />$49 I $56 I $62 I $68 I $79 <br />$56 I $62 I $68 <br />$79 I $84 I $89 I $94 I $99 <br />$145 <br />$220 <br />$110 <br />$144 <br />$168 <br />$331$621$72/ <br />(-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.