Laserfiche WebLink
CC Regular Session <br />Meeting Date: 06/26/2012 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Information <br />Title: <br />Approve Comprehensive Utility Reports; Sanitary Sewer and Water System Studies <br />7. 5. <br />Background: <br />On August 23, 2011 staff met with the City Council in work session to review the City's 2011 development cost <br />study. This was a comprehensive review of where the City currently stands in relation to other municipalities with <br />regard to development costs (utility trunk fees, building permit fees, escrows, etc.). During that meeting utility rates <br />were discussed; particularly how those rates are determined. Rates are determined by taking a comprehensive look <br />at the City's utility system, projecting future growth, and then determining the infrastructure needs to support such <br />growth. A plan is then developed that outlines potential timelines and costs for infrastructure improvements. The <br />ultimate costs to construct and maintain that utility system is then evaluated to determine the appropriate funding <br />mechanism to distribute those costs to users and/or the development community. Revisions to those rates are then <br />adjusted annually, with the adoption of the annual rates and charges, and are based on the construction index related <br />to inflation and construction costs. <br />On November 15, 2011 the topic of comprehensive utility plan updates, and corresponding rate studies, was <br />discussed by the Public Works Committee. This conversation was timely, in that the City Council wanted to <br />understand how updates to these plans may impact adoption of the City's annual rates and charges. The Council <br />wanted to delay action on adopting rates and charges for 2012 until these utility plan updates were completed. <br />Since that time the 2012 rates and charges were adopted by the City Council in December of 2011, with the idea <br />that the utility fees could be revised (if necessary) once the studies were updated and the results of the rate study <br />completed. On January 10, 2012 the City Council awarded contracts to Bolton & Menk and Landform to undertake <br />this study, which was last completed in 2004. <br />The first order of business in advancing these plan updates was to review growth projections, which was the topic <br />of conversation with the Council on February 6, 2012. Without first understanding the assumptions related to how <br />the City intends to grow, updates to these plans would be extremely difficult. At that meeting Council directed staff <br />to proceed with plan updates using the same assumptions from the existing (2004) comprehensive utility plans and <br />2030 Comprehensive Plan for the City; including growth, densities, and flow projections. These assumptions <br />basically equate to growth at a rate of 260 units per year, with densities ranging from 2.87 to 2.70 people per unit. <br />On March 27, 2012 City staff and our consultants were again in front of the Council at work session to discuss the <br />sanitary sewer system. Direction from that meeting included maintaining a minimum fund balance equal to the <br />average annual expenses over the study period, installation of a lift station to serve the Northeast Sewer Area (area <br />near TH 47 and 167th Ave), and the creation of a residential equivalency factor for high density residential uses. <br />On April24, 2012 City staff and consultants met with Council in work session again to discuss the water system. <br />Direction from that meeting was to carry forward the previous assumptions, as approved by the Council, with <br />respect to growth projections, minimum fund balance, and use of a residential equivalency factor for high density <br />residential development. Additional items discussed and approved at that meeting included the notion of one day <br />treating the domestic water supply for iron and manganese (at a minimum), and planning for the use of surface <br />water to supplement the system. <br />Observations: <br />