Laserfiche WebLink
anywhere within the City provided that the allocation of 3.8 mgd is not exceeded. The City's <br />2030 Comprehensive Plan proposes expansion of the MUSA north of Trott Brook in the north <br />central portion of the City. The plan also shows the majority of the existing rural residential <br />development as Rural Developing land use which is proposed to be serviced with on -site <br />systems. <br />Table 3.1 summarizes the average daily flow from Tables 2.2 and 2.3 for both Sewer Districts. <br />Table 3.1 <br />Average Daily and Peak Flow Summary <br />Average Peak Flow Peak Flow <br />Flow (mgd) Factor (mgd) <br />Mississippi River District <br />Entire District at Full Development 3.741 2.65 9.914 <br />2030 MUSA at Full Development 2.665 3.11 8.288 <br />Full Capacity of Interceptor 9.97 <br />Rum River District <br />Entire District at Full Development 3.827 2.29 8.764 <br />2030 MUSA at Full Development 2.202 2.52 5.549 <br />Full Capacity of Interceptor 8.14 <br />Both Districts <br />Entire City at Full Development 7.568 <br />2030 MUSA at Full Development 4.867 <br />Current MCES Allocation 3.8 <br />Table 3.1 also shows the full capacity of existing interceptors for both Districts. This comparison <br />shows the interceptors have adequate capacity except for the Rum River District interceptor <br />which is about 8 percent over capacity at full development of the entire district. This also shows <br />City of Ramsey Page 3-4 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />