Laserfiche WebLink
that at full development, the 2030 MUSA area sewer flow is expected to exceed the current <br />MCES flow allocation. <br />The 2011 average sanitary sewer flow for Ramsey was 0.800 mgd. The projected sewer flow <br />increase from 2012 to 2031 as shown on Table 2.4 is 1.793 mgd. This results in a total projected <br />2031 sewer flow of 2.513 mgd. Currently, the City's allocation for sewer discharge to MCES <br />facilities is 3.8 mgd. Therefore, the projected 2031 sewer flow is 66 percent of the current <br />allocation. <br />City of Ramsey Page 3-5 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />