My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. SYSTEM EXTENSIONS FOR 2030 MUSA <br />The sanitary sewer trunk system extension and improvement required to service the 2030 MUSA <br />are shown on Figure 1 in the Appendix. The extensions are required generally in three areas <br />which are individually discussed below. The proposed facilities are sized to accommodate the <br />ultimate sewer flow from the entire service area for each extension including the areas outside of <br />the 2030 MUSA boundary. This provides flexibility for allowing future MUSA expansions. <br />1. SUBDISTRICT M3 <br />This subdistrict is located in the southwest corner of the City south of Highway 10. <br />Service to this area will require extensions from the 30-inch trunk sewer on Sunwood <br />Drive. The majority of the area will be serviced by lift station MLS-2 which will <br />discharge to an 18-inch gravity sewer extended to the south side of Highway 10. The <br />proposed trunk sewer on Bowers Drive will provide lateral benefit to the adjacent <br />properties and the trunk cost is therefore limited to the oversizing and over depth costs. <br />The total estimated cost of the trunk sewer improvements to service the M3 subdistrict is <br />$1,831,000. Lateral sewer extensions from the proposed trunk will be required and these <br />costs are not included. <br />2. SUBDISTRICT M4 <br />This subdistrict is located north of Highway 10 and west of Armstrong Boulevard. <br />Service to this area will require extensions from the 18-inch sewer on Bunker Lake <br />Boulevard. The total estimated cost of the 12-inch and 15-inch gravity sewer extensions <br />is $414,500. <br />3. SUBDISTRICTS R21 THROUGH R25 <br />These subdistricts are located north of Trott Brook in the north central portion of the City. <br />Service to this area will require extensions from existing lift station RLS-3 in the <br />Brookfield development. Subdistricts R21 and R22 on the west side of CSAH 5 can be <br />City of Ramsey Page 4-4 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.