Laserfiche WebLink
serviced from an 18-inch gravity sewer extension from the lift station. Subdistricts R23, <br />R24, and R25 on the east side of CSAH 5 will be serviced by trunk sewers flowing to lift <br />station RLS-8. The forcemain from the station will discharge to the proposed trunk sewer <br />in subdistrict R22. <br />Existing lift station RLS-3 was not designed to accommodate the sewer flow from the <br />north side of Trott Brook. The existing pumps will need to be replaced with higher <br />capacity pumps. The existing 8-inch forcemain from lift station RLS-3 will be essentially <br />at maximum capacity after the upgrade of the lift station pumps and will have high head <br />loss from the flow through the pipe. The high head loss requires larger motors on the lift <br />station pumps. To reduce this head loss somewhat, it is proposed to extend a 21-inch <br />gravity sewer north in subdistrict R-1 on Variolite Street from the existing 24-inch trunk <br />sewer. This reduces the forcemain length and related head loss. <br />The lift station upgrade at RLS-3 and the sewer extension in subdistrict Rl are south of <br />Trott Brook but are required to provide sewer service to the subdistricts north of Trott <br />Brook. The lift station upgrade will be required with the initial extension to the north side <br />of Trott Brook. The R1 trunk construction would not be required until service is extended <br />to Subdistricts R23 - R25. The total estimated costs are: <br />Subdistrict R23-R25 $1,288,350 <br />Subdistrict R21 and R22 1,911,000 <br />Subdistrict R1 377,000 <br />Subdistrict RLS-3 215,000 <br />Total: $3, 791, 350 <br />Itemized cost tabulations are provided in Item F in the Appendix. <br />City of Ramsey Page 4-5 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />