My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
serviced from an 18-inch gravity sewer extension from the lift station. Subdistricts R23, <br />R24, and R25 on the east side of CSAH 5 will be serviced by trunk sewers flowing to lift <br />station RLS-8. The forcemain from the station will discharge to the proposed trunk sewer <br />in subdistrict R22. <br />Existing lift station RLS-3 was not designed to accommodate the sewer flow from the <br />north side of Trott Brook. The existing pumps will need to be replaced with higher <br />capacity pumps. The existing 8-inch forcemain from lift station RLS-3 will be essentially <br />at maximum capacity after the upgrade of the lift station pumps and will have high head <br />loss from the flow through the pipe. The high head loss requires larger motors on the lift <br />station pumps. To reduce this head loss somewhat, it is proposed to extend a 21-inch <br />gravity sewer north in subdistrict R-1 on Variolite Street from the existing 24-inch trunk <br />sewer. This reduces the forcemain length and related head loss. <br />The lift station upgrade at RLS-3 and the sewer extension in subdistrict Rl are south of <br />Trott Brook but are required to provide sewer service to the subdistricts north of Trott <br />Brook. The lift station upgrade will be required with the initial extension to the north side <br />of Trott Brook. The R1 trunk construction would not be required until service is extended <br />to Subdistricts R23 - R25. The total estimated costs are: <br />Subdistrict R23-R25 $1,288,350 <br />Subdistrict R21 and R22 1,911,000 <br />Subdistrict R1 377,000 <br />Subdistrict RLS-3 215,000 <br />Total: $3, 791, 350 <br />Itemized cost tabulations are provided in Item F in the Appendix. <br />City of Ramsey Page 4-5 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.