My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the revenue collections are either slowed or accelerated. Maintaining the sewer fund balance and <br />positive cash flow will require that the construction of sanitary sewer expansion be adjusted to <br />match the actual growth. Ultimately, the total residential units and commercial/industrial <br />properties paying connection charges will be the same as current projections. <br />C. SPECIAL AREA SYSTEM IMPROVEMENTS <br />The two alternatives for extending sewer service to this area are discussed in Section 4D. These <br />consisted of a gravity sewer option previously described as the Northeast Trunk Sewer and of a <br />lift station and forcemain option which will service only the Special Area. After review, the City <br />has selected the lift station/forcemain alternate. The alternate has an estimated project cost of <br />$1,296,900. <br />The projected sewer connection charge revenue generated by full development of this Special <br />Area is tabulated in Table 5.3. <br />Table 5.3 <br />Special Area Sanitary Sewer Connection Charge Revenue <br />Land Use Units/Area Connection Total <br />Charge <br />Residential 566 units $1,271/unit $719,386 <br />Commercial/Industrial 7 acres $3,824/acre 26,768 <br />Total: $746,154 <br />Table 5.3 shows that the revenue is about $550,000 short of the estimated project cost. The <br />Special Area requires a sewer pipe extension of over 10,000 feet to provide connection to the <br />municipal sewer system. The Special Area is simply too small to fund the extension with only <br />connection charge revenue. <br />Combining the Special Area Alternate 2 project cost with the 2030 MUSA project costs yield a <br />total cost of $7,333,750. Combining the project revenue yields a total of $8,226,474. The revenue <br />City of Ramsey Page 5-4 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.