My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/26/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 06/26/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:19:07 PM
Creation date
8/28/2012 1:50:17 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/26/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
405
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
results in 475 acres total for the 19 year period. The projected sewer connected charge revenue <br />for 2012 to 2031 is tabulated in Table 5.2. <br />Table 5.2 <br />2012 - 2031 Sanitary Sewer Connection Charge Revenue <br />Land Use Units/Area Connection Total <br />Charge <br />Residential 4,940 units $1,271/unit $6,278,740 <br />Commercial/Industrial 475 acres $3,824/acre 1,816,400 <br />Total. $8,095,140 <br />Comparison of Tables 5.1 and 5.2 shows that the projected revenue exceeds the improvement <br />costs by about $2,000,000. This is based on no portions of the improvements being funded by <br />developers. <br />The three areas serviced by the proposed 2012-2031 sewer system improvements have a <br />projected total of 2,935 residential units and 378 acres of commercial/industrial area. Both of <br />these are less than the projected total development for 2012 to 2031. The entire 2031 MUSA <br />consisting of previous MUSA plus the new additions would provide an estimated total of 12,553 <br />residential units with a population of 33,893. This population is well in excess of the estimated <br />2031 population of 25,828. Based on density and household size criteria used in this Study, the <br />2030 MUSA would support 2,987 units more than required for the 2031 population. These units <br />would provide sewer connection charge revenue without significant expenses for system <br />improvements. <br />The proposed improvements are sized to accommodate the sewer flows from the entire service <br />area for each improvement including the areas outside of the 2030 MUSA boundary. Therefore, <br />the benefit for these improvements extends outside of the 2030 MUSA. Any MUSA expansions <br />beyond 2030 would generate additional connection charge revenue. <br />The connection charge revenue is based on development rates and therefore if actual rates differ, <br />City of Ramsey Page 5-3 <br />Comprehensive Sanitary Sewer Plan - 2012 Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.