Laserfiche WebLink
95 a required element. Walls shall be articulated such that no wall exceeds 100 feet <br />96 in length without visual relief. Visual relief may be defined as the incorporation <br />97 of design features such as windows, horizontal and vertical patterns, contrasting <br />98 material colors. or varying wall depths. Use of fiber cement trim, soffit and fascia <br />99 shall be allowed as accent materials. <br />100 <br />101 (4) Additional Office Park Building Design requirements <br />102 <br />103 a. A minimum of thirty percent (30%) of the ground level facade <br />104 shall be transparent. <br />105 b. Visual continuity shall be created by designing buildings to exhibit <br />106 complementary height and utassing to adiacent buildings. <br />107 c. Buildings shall be designed in an architecturaj style and <br />108 constructed of materials that are compatible, and complementary to <br />109 surrounding buildings in the Office Park District. <br />110 <br />111 (l Restricted Exterior Materials: Unadorned pre-6�.„66k.,J concrete panels, <br />112 whether smooth or raked, non-decg1ytive concrete bloc1 sheet meta, corrupted <br />113 metal or unfinished metal shall not be used as exterior materials. This restriction <br />114 shall apply to all principal structures and to jj accessory buildings except those <br />115 accessory buildings pot visible from any property line. No more than twenty-five <br />116 percent (25%) of any exterior wall on a building shall be fiber cement siding,. <br />117 yvood or metal accent material. <br />118 <br />119 Roofs: Roofs which are exposed or an integral part of the building <br />120 aesthetics shall be constructed only of commercial grade asphalt shingles, wood <br />121 shines, standing seam metal, slate, tile, or copper. Flat roofs, which are <br />122 generally parallel with the f 1'st floor elevation, are not subject to these material <br />123 limitations. <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />130 <br />131 <br />132 a. Exceptions: Rooftop screening standards <br />133 shall not apply to E-1 and E-2 zoned 0i0,A...tii:6. <br />134 <br />135 b. Acceptable Roof -based Mechanical <br />136 Equipment Screening: <br />137 1. Parapet walls or other technigpes <br />138 included as an inteal part of the <br />(7) Building Mecl aical Equipment: All roof vents, pipes and/or other roof <br />penetrations (except chimneys), shall be fully screened. located on the rear <br />elevations, or be otherwise configpred to the maximum extent practicable to have <br />a minimal visual impact as seen from a public street. Wood fencing or chain link <br />fencing with slats shallpot be used for screening. A cross -sectional drawing <br />shall be provided that illustrates the slgjht lines from the ground level view. <br />3 <br />