Laserfiche WebLink
Ramsey Ped/Bike SHIP Master Plan Project List, cont. <br />1 <br />2 <br />0 <br />H <br />z_ <br />2 <br />0 <br />V <br />m <br />0 <br />re <br />0 <br />VI <br />00 <br />c <br />0 <br />V <br />N <br />m <br />a <br />a <br />VI <br />10 <br />0 <br />Ped Crossing/Intersection Improvements -SORTED BY COST MIN. TO MAX. <br />Name Recommendations I Estimated Cost <br />Highway 10 and Co. Rd. 83 Minor- Retrofit Existingv Siivnal with Pedestrian Countdown timers $7,500.00 <br />Highway 10 and Co. Rd. 56 Minor- Retrofit Existing Signal with Pedestrian Countdown timers $7,500.00 <br />Highway 10 and Co. Rd. 57 Minor- Retrofit Existing Signal with Pedestrian Countdown timers $7,500.00 <br />00'OOS'Z£$ <br />00'OOS'L$ <br />00'OOS'L$ <br />00'OOS'L$ <br />0 0 <br />0 0 <br />O O <br />O O <br />N N <br />N N <br />m m <br />U} U} <br />$32,500.00 <br />$32,500.00 <br />$32,500.00 <br />$32,500.00 <br />$32,500.00 <br />$32,500.00 <br />O 0 <br />0 0 <br />O O <br />O O <br />N O <br />N 0 <br />m 0 <br />U} N <br />U} <br />0 0 <br />0 0 <br />O O <br />O O <br />O O <br />0 0 <br />0 <br />N N <br />U} U} <br />0 0 <br />0 0 <br />O O <br />O O <br />O O <br />0 0 <br />0 <br />N N <br />U} U} <br />0 0 <br />0 0 <br />O O <br />O O <br />O O <br />0 0 <br />0 0 <br />O O <br />O O <br />O O <br />0 0 <br />0 <br />N NN <br />U} U} <br />0 0 <br />0 0 <br />O O <br />O O <br />O O <br />0 0 <br />0 <br />O <br />U} y <br />t/T <br />$1,000,000.00 <br />IN PROGRESS <br />0 0 <br />0 <br />N N <br />U} U} <br />Minor- Retrofit Existing Signal with Pedestrian Countdown timers <br />Minor- Retrofit Existing Signal with Pedestrian Countdown timers <br />Minor- Retrofit Existing Signal with Pedestrian Countdown timers <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Minor- Flashing lights, crosswalks to be installed along with future connections <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major -Traffic Light <br />Major- Potential Roundabout <br />Major- Potential Roundabout <br />Traffic Light under construction <br />Co. Rd. 47 and Bunker Lake Blvd <br />Co. Rd. 47 and Sunwood Dr <br />Co. Rd. 47 and Alpine Dr <br />Co. Rd. 83 and 173rd <br />167th Ln NW (Autumn Heights Park Crossing) <br />Co. Rd. 83 and 161st (Central Park Crossing) <br />Greenway Crossing (Wetland corridor) at Co. Rd. 56 <br />173rd and Co. Rd. 5 <br />Greenway Crossing (Trott Brook) at Co. Rd. 5 <br />Co. Rd. 56 and 148th St <br />ICo. Rd. 47 and 179th <br />I173rd and Wetland Corridor Trail (Off -road trail) <br />Co. Rd. 47 and 142nd Ave NW <br />Bunker Lake Blvd. and Sunwood Dr. <br />Co. Rd. 5 and Alpine Dr. <br />Co. Rd. 5 and Sunwood Dr. <br />Co. Rd. 56 and Alpine Dr. <br />Co. Rd. 57 and Bunker Lake Blvd <br />Co. Rd. 57 and Sunwood Dr. <br />Co. Rd. 7 and 179th St <br />Co. Rd. 83 and Alpine Dr. <br />Co. Rd. 83 and Bunker Lake Blvd. <br />Co. Rd. 83 and Sunwood Dr. <br />Co. Rd. 5 and Co. Rd. 56 <br />Co. Rd. 5 and Co. Rd. 57 <br />Co. Rd. 57 and Alpine Dr. <br />