My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 09/25/2012
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2012
>
Agenda - Council Work Session - 09/25/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:23:33 PM
Creation date
9/20/2012 4:13:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
09/25/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Work Session 2. 2. <br />Meeting Date: 09/25/2012 <br />By: Mark Riverblood, Engineering/Public <br />Works <br />Title: <br />Update on Process and Progress of the Mississippi Skyway <br />Background: <br />The proposed pedestrian overpass over US Hwy's # 10 & #169 known as the Mississippi Skyway has been discussed <br />for many years and is gaining momentum with considerable progress in the recent months. <br />The most recent success (aside from the physical construction of the Northstar rail station skyway that this project <br />will connect to) is the pending award of $100,000 in Transit Oriented Development funding for finalizing the <br />planning for this project. Specifically, the TOD application stated that: <br />The TOD Pre -Development funds will be used to collect and prepare all remaining information and approvals for <br />the 'Mississippi Skyway' (except the actual Bidding Documents) for submission for Federal Funding (see Sec. IV, 1 <br />above). To include: <br />A) Base information gathering required to perform final design process: $45, 000 - <br />geotechnical, survey & project team site analysis. Create documents (with graphics to clearly present and <br />communicate design ideas), and establish professional direction and permitting required to perform geotechnical, <br />soil borings, and surveys. <br />B) Complete planning process, secure approvals on final alignment, (public & agencies): $55, 000 -Coordination <br />with all rail and transportation agencies as required at Federal, State, County & City levels to secure written <br />approval on final alignment including approved proposed bridge pier locations and specifications. Refine plan <br />layout and detail design to have clear and complete MnDot approval on these directives prior to beginning <br />Construction Documents. <br />Additionally, while there has been a steady progression of movement for the Mississippi Skyway, there remains <br />several important elements that need to come together in sequence to stage this project for funding. Staff will <br />review these details at the work session with the latest information. <br />Funding Source: <br />N/A <br />Council Action: <br />Based upon discussion <br />Attachments <br />Schematic design for footprint <br />Relationship to Northstar and Skyway Over Park Plan <br />Form Review <br />Inbox <br />Reviewed By Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.