My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/09/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/09/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:19 PM
Creation date
10/4/2012 4:16:54 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/09/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
340
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHA GE ORDER g3 <br />DATE <br />PROJECT NAME <br />PROJECT NUMBER <br />CIVIL SHEETS ISSUED <br />• • <br />• • <br />L ANDFOR M <br />From Site to Finish <br />105 South Fifth Avenue Tel: 612-252-9070 <br />Suite 513 Fax: 612-252-9077 <br />Minneapolis, MN 55401 wwwJan dform.net <br />September 14, 2012 <br />Sunwood Drive Realignment, SAP 199-104-010, CP 12-20 <br />RAM 12019_.._._..-.__,___.._.._-..... <br />4AR, 22AR, 25AR-26AR, 34AR , 2BR, 4BR, 6BR <br />SPECIFICATIONS SECTION ISSUED None <br />SHEET 4AR: STORM SEWER TABULATIONS (SHEET 1 OF 1) <br />a) REVISED structure 123 offset and casting elevation, <br />SHEET 22AR: EXISTING CONDITIONS & REMOVALS PLAN <br />b) REVISED limits of pavement removal, ADDED remove existing storm sewer stub <br />SHEET 25AR: PROFILE AND STORM SEWER PLAN (SHEET 2 OF 5) <br />a) REVISED structure 5004 notes to include new sewer connection. <br />SHEET 26AR: PROFILE AND STORM SEWER PLAN (SHEET 3 OF 5) <br />a) REVISED curb alignment and structure 123 <br />SHEET 34AR: CONSTRUCTION PLAN (SHEET 6 OF 6) <br />a) REVISED curb alignment and taper <br />SHEET 2BR: MASS GRADING, DRAINAGE, EROSION & SEDIMENT CONTROL PLANS, SUNWOOD <br />RETAIL <br />a) ADDED concrete crosswalk and ADA ped Ramps <br />b) ADDED valley gutter <br />c) REVISED road grades <br />SHEET 4BR: STORM SEWER PLAN AND PROFILE, SUNWOOD RETAIL <br />a) REVISED P-900 storm sewer pipe slope. <br />b) REVISED structure 901 rim elevation <br />c) REMOVED pipe run 901 to 902. <br />d) REVISED structure 902 and pipe P-902 <br />e) ADDED Structure 902A and pipe P-902A <br />SHEET 6BR: ACCESS DRIVE PLAN AND PROFILE, SUNWOOD RETAIL <br />a) ADDED sheet, refer to tabulations for quantities <br />Supplemental Information: Change Order #3 Tabulations, Change Order #3 Plans <br />END OF CHANGE ORDER #3 <br />If any of these items are unclear or in need of further clarification contact the Engineer at (612) 638-0243. <br />Lend? orm , SenslblyGreen and Site to rinlsh® are registered service marks of Landform Professional Services, LLC. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.