Laserfiche WebLink
NORTII PINE <br />AGGREGATE' INC, <br />14551 Lake Drive I Forest Lake, MN 55025 1651,464,6802 <br />To: City Of Ramsey <br />Address; 7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />Project Name: CSAH 83 & 147th Ave Change Order #3 <br />Project Location: Existing Sunwood Drive & Access Drive, Ramsey, MN <br />Contact: <br />Phone: (763) 427-1410 <br />Fax: (763) 427-5543 <br />Bid Number: 12-079 <br />Bid Date: 9/21/2012 <br />Item # Item Description Estimated Quantity Unit Unit Price Total Price <br />A. Alternate 3 , <br />1 Remove Existing 2x3 Catch Basin 1,00 EACH $365,00 $365,00 <br />2 Remove Curb & Gutter 32.00 LF . $1.40 $44.80 <br />3 Remove Concrete Crosswalk 84.00 SF $1.80 $151,20 <br />4 Remove Bituminous Pavement 60,00 SY $2.45 $147.00 <br />7 15" RC Pipe Sewer Design 3006 Class IV 69.00 LF $33.00 $2,277.00 <br />8 Connect To Existing Storm Structure 1.00 EACH $2,625.00 $2,625.00 <br />10 Construct Drainage Structure 2x3 Box 1.00 EACH $1,500.00 $1,500.00 <br />11 Construct Drainage Structure DES 48-1020 1,00 EACH $1,600,00 $1,600.00 <br />12 Casting Assembly 1,00 EACH $750,00 $750,00 <br />13 Install Casting 2.00 EACH $150,00 $300,00 <br />14 4" Concrete Sidewalk 167.00 SF $31.05 $5,185,35 <br />`� , 15 B612 Curb & Gutter 32.00 LF $30,60 $979,20 <br />16 8" Concrete Pavement 90,00 SY $76.50 $6,885.00 <br />.*17 B618 Curb & Gutter 67,00 LF $31,60 $2,117.20 <br />Total Price for above A. Alternate 3 Items: $24,926.75 <br />B. Contract Deduct <br />1 Aggregate Base (CV) Class 5 Modified 2.56 CY ($20.75) ($53,12) <br />2 Type SP 12,5 Wearing Course Mix (4,C) 2.09 TON ($64,85) ($135.54) <br />3 Type 12,5 Non Wear Course Mix (4,B) 3.48 TON ($62,75) ($218,37) <br />4 18" RC Pipe Sewer Design 3006 Class IV 32.00 LF ($30,00) ($960.00) <br />Total Price for above B. Contract Deduct Items: ($1,367.03) <br />Notes: <br />• Price does not Include: Clearing & Grubbing; Site Surveying; Soil Testing; Gravel or Bituminous; Building or Structure Demolition; Hidden or Buried <br />Debris; Hazardous Materials Removal; Dewatering; Import and/or Export of Dirt; Site Utilities other than those listed above; Moving of Small <br />Utilities; Any Subsoil Corrections or Trench Borrow; Traffic Control; <br />o Pricing is based on the engineer(s) plans dated: Change Order #3 dated 9/11/12, shts 4AR, 22AR,25AR,26AR,34AR,2BR,4BR <br />• Proposal is valid for a period of 30 days from date of proposal. <br />o Any delays due to incomplete surveying or improper surveying could result in additional charges. <br />• Price does not include lowering/moving small utilities, If there are utilities not properly represented on plans, price is subject to change. <br />• All grading needs to be verified by civil engineer as grading is completed. <br />Payment Terms: <br />Net due upon receipt of billing, A 1.5% per month service charge will be assessed on unpaid balance. <br />9/21/2012 5:00:46 AM Page 1 of 2 <br />