Laserfiche WebLink
Review File: Super America <br />Site Plan Review <br />September 28, 2012 <br />Revised October 12, 2012 <br />Page 6 of 7 <br />Landscape Review <br />Reviewer. Chris Anderson <br />canderson(a�ci. ramsev. mn. us <br />763-433-9905 <br />Landscaping Plan: The proposed landscaping of the site interior is generally acceptable. The streetscape <br />landscaping is being completed as part of the Sunwood Dr realignment project. Please note that copies of <br />the topsoil load tickets will be required to verify the source of the material (there are pre -approved' <br />suppliers that have provided testing to verify material meets specification). If amending onsite topsoil, or <br />if using a supplier other than one that is pre -approved', documentation must be supplied to the City to <br />verify that the amended material meets Mn/DOT's Premium Topsoil Borrow specification. <br />Tree Preservation: This site is devoid of any significant tree cover and therefore, no tree preservation <br />plan is necessary. <br />Civil Engineering Review <br />Reviewer. Leonard Linton, Civil Engineer H <br />llinton(a�ci. ramsev. mn. us <br />763-433-9834 <br />Grading and Drainage: The following comments are offered regarding the September 5, 2012 Grading <br />and Utility Plans prepared by Landform: <br />• The B612 concrete curb detail should be amended to include base material extending to 1' <br />beyond the back of curb. <br />• The drainage from the west half of the site flows into the common access drive along the west <br />edge of the site. Additional catch basins must be added at the western entrances to capture runoff <br />before it leaves the site. All catch basins must be depressed to capture runoff before it leaves the <br />site. <br />• Details for the Ecostorm device must be submitted. <br />• A maintenance agreement for the Ecostorm Device must be submitted. <br />• A turning template was provided for the fuel trucks. The owner should weigh in on the site <br />layout as it pertains to fuel tanker access to the site. <br />The project will require a permit from the Lower Rum River Water Management Organization <br />(LRRWMO). The LRRWMO requirements include infiltration of 1 inch of runoff from the site. <br />The following notes should be added or amended on the plan set: <br />• The contractor should have a sweeper on site or available within 3 hours. All material tracked <br />onto City streets must be removed immediately upon discovery, or as directed by the City <br />Engineer. <br />• Installation of silt fence and other down gradient sediment protection measures shall be <br />completed and inspected prior to commencement of any site activities. <br />Street and Building Access: Three accesses to the common access drive are proposed for Lot 5, Block 1 <br />COR TWO. <br />