My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/23/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:24:58 PM
Creation date
10/19/2012 1:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/23/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
560
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.—• <br />• <br />7 _ <br />Task 2 — Develop Non -Site -Specific Plan for Full <br />Service, Year -Round Recycling Drop-off Center <br />Foth will develop a plan for a full service, year round facility that has <br />the following components: <br />• Basis for planned capacity, including acceptable materials now <br />and as envisioned for the future, form(s) of acceptable materials <br />(co -mingled, partially separated, processed, loose only, etc.) and <br />through -put customer visits and tonnage estimates. <br />• Recommendations for minimum property size necessary, and for <br />additional property required for expected future operations. <br />• Recommendations for minimum building requirements, and <br />requirements for expected future operations, including: <br />► Size, exterior finish to comply with zoning requirements, loading <br />and processing areas, interior layouts, safety and hygiene needs, <br />meeting room or community needs, future expansion layouts and <br />accommodations <br />► Options for a Sustainable Building (LEED or equivalent <br />standards), and sustainable practices in the operation of the <br />facility. <br />• Recommendations for optimal configurations of a site, including <br />dedicated customer and vendor traffic flow, one-way throughput, <br />turning and storage areas, etc. <br />• Recommendations for equipment needs for the immediate, mid and <br />long term uses of the facility, including scenarios for partner and <br />City operations. <br />• Estimate of base cost, excluding land and land development costs, of <br />the initial facility. <br />Task 2 Deliverables: <br />• Draft report containing the items in Task 2, including tables and <br />figures describing facility and operations. <br />Task 2 Timeline: Six weeks after kick-off meeting. <br />Recycling Drop -Off Center Analysis & Plan Development <br />City of Ramsey, MN —October 2012 <br />*Foth <br />3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.