Laserfiche WebLink
Councilmember <br />adoption: <br />introduced the following resolution and moved for its <br />A RESOLUTION APPROVING THE ISSUANCE OF A CONDITIONAL USE PERMIT <br />TO SAUTER AND SONS INC. TO PROCESS DEMOLITION CONCRETE IN THE E-2 <br />EMPLOYMENT DISTRICT, BASED ON FINDINGS OF FACT # , AND <br />DECLARING TERMS OF SAME. <br />WHEREAS, Sauter and Sons, Inc. (the "Permittee") has properly applied to the City of <br />Ramsey (the "City") for a Conditional Use Permit (the "Permit") to process demolition concrete <br />on the property generally known as 6651 141st Avenue N.W. and legally described as follows: <br />Lot 1, Block 1, Gateway North Industrial Park No. 5, Anoka County, <br />Minnesota <br />(the "Subject Property"); and <br />WHEREAS, The Planning Commission met on May 3, 2012, conducted a public hearing <br />and recommended City Council approval/denial of the request. <br />NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY <br />OF RAMSEY, ANOKA COUNTY, STATE OF MINNESOTA, as follows: <br />A conditional use permit for the storage and processing of demolition concrete and bituminous <br />on the Subject Property is hereby granted to the Permittee. <br />1. This Permit shall remain in effect so long as the conditions imposed herein are complied <br />with. <br />2. The stockpiled demolition concrete and bituminous materials on the Subject Property <br />shall not exceed a footprint of ninety (90) feet by two hundred (200) feet; the stockpiled, <br />processed concrete and bituminous materials on the Subject Property shall not exceed a <br />footprint of ninety (90) feet by two hundred (200) feet; at no time shall either stockpile of <br />demolition or processed concrete and bituminous materials exceed a height of fourteen <br />(14) feet, as measured from the existing ground elevation over which the materials are <br />placed. <br />3. Screening, both proposed and existing vegetation as indentified on the site plan, herein <br />referred to Exhibit 1, shall be installed within one (1) month of approval of the Permit. <br />The Permittee shall provide the City with a financial surety, in a form acceptable to the <br />City, in the amount of Four Thousand Five Hundred Dollars and no cents ($4,500.00), <br />which is 125% of the estimated cost of improvements, to ensure the completion of the <br />screening requirement. Upon total completion of screening requirements and acceptance <br />by the City, the Permittee may request a release of the financial surety. <br />RESOLUTION #12-05- <br />Page 1 of 5 <br />