My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/03/2012
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2012
>
Agenda - Planning Commission - 05/03/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:11:01 AM
Creation date
10/31/2012 4:17:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/03/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. The Permittee shall be responsible for maintaining and replacing all required screening <br />throughout the duration of the Permit. <br />5. The Permittee shall be required to conform to the Minnesota Pollution Control Agency <br />standards as to the regulation of noise, odors, dust and any other health and safety issues <br />applicable to the processing of demolition concrete and bituminous materials. The <br />Permittee shall provide the City with a copy of any permits or correspondence from any <br />regulatory agencies that are applicable to the processing of demolition concrete and <br />bituminous material on the Subject Property. <br />6. The Permittee shall be responsible for any necessary testing to verify compliance with <br />state standards upon the premise that an environmental problem may exist. <br />7. Hours of material crushing shall be limited to 7:00 a.m. through 5:00 p.m. Monday <br />through Saturday. Any variance from these hours of operation shall require prior special <br />approval by the City Administrator or his/her designated representative. <br />8. Crushing operations will be conducted one (1) time per year. The crushing period shall <br />not exceed three (3) days in duration. Should either an emergency, equipment failure, <br />weather, or any other unforeseen event cause the crushing operation to cease, the <br />crushing operation shall not extend beyond the three (3) day period, except in accordance <br />with procedures as outlined in Condition #6. <br />9. The Permittee shall notify the City by letter at least one (1) week prior to each crushing <br />period. The notification shall indicate the dates that the crushing will occur. <br />10. Should a situation arise pertaining to noise, dust, or any other health, safety, or general <br />public welfare issues, the City may contact the MPCA, Anoka County, or other qualified <br />environmental testing companies or agencies to investigate the situation. All testing <br />would be at the Permittee's expense. <br />11. Any permits issued by any other regulatory agencies are hereby incorporated by reference <br />into these conditions and made a part of this Permit as if fully set forth herein. However, <br />where the City and other jurisdictional standards conflict, the more stringent standards <br />shall apply. <br />12. The Permittee shall provide written evidence of any and all required permits from other <br />agencies prior to commencing any crushing activity. <br />Noise standards shall be the same as those set forth in the MPCA standards and within <br />Ramsey City Code Section 30-5 (Nuisances affecting public peace). Dust shall be <br />controlled by the Permittee in the following manner: <br />a. A water truck will be stationed on the premises at all times. The Permittee shall <br />be responsible for wetting down the areas where the trucks are hauling material to <br />lessen the dust caused by the traffic. <br />RESOLUTION #12-05- <br />Page 2 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.