My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 05/03/2012
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2012
>
Agenda - Planning Commission - 05/03/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:11:01 AM
Creation date
10/31/2012 4:17:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
05/03/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Regular Planning Commission 5. 1. <br />Meeting Date: 05/03/2012 <br />By: Chris Anderson, Community <br />Development <br />Information <br />Title: <br />PUBLIC HEARING: Consider Request for a Conditional Use Permit to Process Demolition Concrete in the E-2 <br />Employment District and to Stockpile Sand/Soil on a Property in the E-2 Employment District at 6651 141st Ave <br />NW; Case of Sauter and Sons, Inc. <br />Background: <br />Tom Sauter of Sauter and Sons, Inc., owns the property located at 6651 141st Ave NW and the adjacent vacant <br />parcel to the west (14191 Ebony St NW). Sauter and Sons, Inc., is in the excavation and demolition business and is <br />currently stockpiling demolition concrete and asphalt on the property at 6651 141st Ave NW and has multiple <br />stockpiles of sand/soil on the vacant parcel to the west. Staff became aware of the stockpiled concrete and asphalt <br />and informed Mr. Sauter that the demolition concrete and asphalt are considered solid waste (confirmed by the <br />MPCA) and therefore requires a conditional use permit. Section 117-427 of City Code requires a conditional use <br />permit for storage, collection, transportation, treatment, utilization, processing, transfer, intermediate disposal and <br />final disposal of solid waste, recyclable materials, or processed waste product. Mr. Sauter has submitted an <br />application for a conditional use permit to process demolition concrete and asphalt into an aggregate to be used on <br />other job sites. Through this application, Staff saw an opportunity to address the outside storage (sand/soil <br />stockpiles) on the adjacent vacant parcel simultaneously. <br />Notification: <br />In accordance with State Statute and City Code, Staff attempted to notify all property owners within 1,000 feet of <br />the Subject Property of the Public Hearing via Standard US Mail. A Notice of Public Hearing was also published in <br />the Anoka County Union. <br />Observations: <br />The property at 6651 141st Ave NW is zoned E-2 Employment District and is approximately ten (10) acres in <br />size. The vacant parcel is zoned PUD and is approximately four (4) acres. The surrounding properties are also <br />zoned E-2 Employment District, with the exception of the two parcels to the east of 6651 141st Ave NW, which are <br />zoned E-1 Employment District and PUD. The applicant has stated that they own approximately twenty-one (21) <br />acres of land in this area including the two properties in question as well as a couple other buildings. <br />6651 141st Ave NW <br />Sauter and Sons, Inc., is in the excavation and demolition business. Mr. Sauter is requesting the conditional use <br />permit to process demolition concrete and asphalt from their job sites into an aggregate that can be reused for rock <br />entrances to construction sites and as base material for parking lots. Mr. Sauter has stated that this would not be <br />open to the public to dispose of used concrete and asphalt. Mr. Sauter has stated that he is pursuing this in an <br />attempt to be more competitive in the construction field. <br />Mr. Sauter has stated that the crushing activity would be conducted one time per year. It would take one (1) day to <br />set up the equipment and three (3) days to crush the material. Crushing would occur between the hours of 7:00am <br />and 5:OOpm. The processed material would also be stockpiled on the property for use by Sauter and Sons, Inc. on <br />their various job sites. <br />According to the site plan submitted, the stockpiled demolition concrete and asphalt would be confined to an area <br />that is ninety (90) feet wide by 200 feet deep. The demolition concrete and asphalt stockpile is adjacent to an <br />
The URL can be used to link to this page
Your browser does not support the video tag.