My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 12/11/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:26:55 PM
Creation date
12/12/2012 8:22:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUNWOOD DRIVE REALIGNMENT (MSAS 199-104-005) <br />Brief Description of Project work type: <br />This project proposes to construct a roadway realignment that would serve as the main access point to the COR, the City <br />of Ramsey's 400 acre transit oriented development. The new intersection of Sunwood Drive and CSAH 83 (Armstrong <br />Boulevard) would include a traffic signal for improved capacity and access management at a consolidated "front door" <br />to the COR, thereby reducing congestion on the adjacent County roadway system. Additional design features include <br />the reconstruction of CSAH 83 to a 4-lane divided roadway, dedicated turn lanes, a roundabout, raised medians, and <br />pedestrian amenities. <br />This project is being considered as an initial phase to advance construct portions of a future grade separated <br />interchange at CSAH 83 and Trunk Highway 10. This interchange would enhance public safety response to the southern <br />portion of the City; which is currently isolated due to the at -grade Burlington Northern Sante Fe (BNSF) railroad <br />crossings, and the 45,000 motorists that pass through the City of Ramsey every day along TH 10. Both the City's police <br />and fire departments are located less than one mile from this location on the north side of TH 10, and ambulance <br />services that rely on TH 10 to transport patients to nearby hospitals have no ability to cross the BNSF railroad tracks <br />during emergency situations, thus resulting in delays that could prove critical. <br />Project's contribution to other local. regional, or state economic development or redevelopment efforts: <br />This roadway realignment would reconstruct the main entrance into the COR, which has been gaining momentum with <br />the recently completed Veterans Affairs and Allina Clinics, purchase agreements and development approvals for 230 <br />units of market rate apartments, 90 units of assisted senior living, and overwhelming support and approvals for a <br />Northstar Commuter Rail station. The project would provide a safe convenient access location for both vehicular and <br />pedestrian movements, and accommodate the projected development build out. The proposed roadway alignment <br />would also frame and create a prime development opportunity in this location, and open up additional prospects for <br />economic development initiatives. Ultimately, the future CSAH 83/TH 10 grade separated interchange would serve as a <br />long term catalyst to cultivate additional economic development opportunities within the community and region. <br />Proiect's transportation deficiency and proposed safety strateav: <br />The current Sunwood Drive and Armstrong Boulevard intersection has limited visibility and capacity due to the existing <br />geometrics and proximity to the BNSF railroad. In addition, traffic volumes and pedestrian movements are increasing <br />with every new advancing development proposal In the area. This project will reduce existing intersection conflicts by <br />consolidating access points at a new signalized intersection, and provide dedicated turn lanes. It will also support <br />improved operations through an integrated roundabout and coordinated signal system, which will be synchronized with <br />the recently completed intersection improvements at CSAH 83 and Bunker Lake Boulevard (CSAH 116) and the future <br />signal system associated with the CSAH 83/TH 10 interchange. <br />
The URL can be used to link to this page
Your browser does not support the video tag.