My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/11/2012
Ramsey
>
Public
>
Agendas
>
Council
>
2012
>
Agenda - Council - 12/11/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 12:26:55 PM
Creation date
12/12/2012 8:22:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/11/2012
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
331
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cross Sections <br />The typical street section will be ran in order to cut cross sections at 50 foot <br />intervals. The typical street section will label the location of roadway centerline, <br />pavement thicknesses and types of material. The cross sections will show the impacts <br />to adjustments to the vertical profile in regards to right-of-way and easement <br />impacts, touch -down locations, drainage impacts, utility impacts, etc. <br />Detailed Design for Sanitary Sewer and Watermain <br />The detailed design for the sanitary sewer and watermain will be completed. All <br />invert elevations, pipe sizes and pipe slopes will be labeled for the sanitary sewer. <br />The profiles will be created for both the sanitary sewer and watermain. The pipe <br />sizes, hydrant locations, DIP fittings, and hydrant elevations will be determined. <br />Detailed Design for Stormwater Related Improvements <br />The hydrologic model will be refined. A drainage area map will be created and the <br />size of the drainage basins will be identified. The curve numbers and time of <br />concentration for the contributing areas will be estimated. The ponding areas will be <br />identified and will be modeled, and the 2-YR, 10-YR, and 100-YR elevations will be <br />determined. <br />The storm sewer will be sized by identifying the sub -watershed areas and a storm <br />sewer drainage map will be created. Storm sewer will be sized for the 10-year return <br />frequency. The need for stubbing storm sewer to adjacent property will be analyzed. <br />The inlet spread will be determined and additional catchbasins will be added if <br />necessary. <br />The limits of the construction will be analyzed to determine all areas where runoff <br />will enter and leave the site to ensure that no drainage issues are created. A drainage <br />pattern exhibit will be prepared. <br />Detailed Design for Trail/Sidewalk Facilities <br />The detailed design for trail and sidewalk facilities, if any, will be completed. <br />Construction Details <br />Provide details of all standard features and other required special details to fully <br />communicate the construction requirements. <br />Landscaping Plan <br />The landscaping plan will be prepared, which will inform the Contractor of the <br />method of restoration expected, plantings, trees, etc. <br />Detailed Design for Highway 10 Improvements <br />The detailed design for the improvements within the Highway 10 right-of-way will <br />be prepared. The turn lane lengths, geometry, pavement sections, etc. will all be <br />designed per Mn/DOT standards. <br />Traffic Control Plan <br />Traffic control and staging plans will be prepared. Detour routes/local access will be <br />analyzed. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.