My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/03/2013
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 01/03/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:17:14 AM
Creation date
1/2/2013 8:48:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
01/03/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />12/28/12 <br />PROJECT ADDRESS <br />TBD — XXXX SUNWOOD DR <br />PROJECT. TITLE <br />MCDONALDS <br />EscRow # <br />113443 <br />DEPARTMENT: <br />Engineering <br />TECHNICAL REVIEWER: <br />Name: Leonard Linton <br />Phone:763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />We offer the following comments regarding your site plan submittal dated November 26, 2012 prepared <br />by Landform. This plan set makes reference to connecting to existing curb, sanitary sewer, storm sewer <br />and watermain. These facilities were not in place at the time of review. Coordination will be required if <br />this project advances to construction prior to installation of the off site utilities. <br />Demolition Plan: <br />A demolition plan is included with the set. This sheet does not show any work to be performed. The <br />notes make reference to building removal. There has never been a building on the site. The adjacent work <br />by others has not been installed as noted above. The demolition sheet should be revised to reflect the <br />demolition work required or be removed from the plan set. <br />Grading and Drainage: <br />• Please make sure that all items shown on the various plan sheets are either clearly noted on the <br />plans or are referenced in the legend. <br />• The pedestrian ramp details have recently been modified at the state level, and the plans should <br />be revised to include the most recent Mn/DOT approved detail and design. <br />• Silt fence must be installed along the southern edge of the site. <br />• We are continuing to evaluate the submitted stormwater plan and associated calculations so <br />additional comments may be forthcoming. The site storm sewer system drains into a common <br />system shared by lots 3, 4 and 5 of COR TWO which includes an underground storage <br />component. Updated calculations have not been received for inclusion io <br />• A maintenance agreement will be required for the proposed nonpublic storm sewer system <br />outlining responsibilities of the respective parties and the maintenance schedule for the system. <br />This document must be approved and recorded against the property at the time of site plan <br />approval. <br />• Inlet protection must be provided for all existing catch basins adjacent to the site. <br />• The NPDES summary on sheet C 3.1 does not match the data provided on sheet C 2.1. <br />• Revise or remove note 9, sheet C3.1. There is no curb to match into. <br />Please note on the plans if there is any dewatering required for this project. If so, the City will want to <br />review the dewatering plan prior to implementation. No dewatering activities can occur until the required <br />permit is secured and submitted for review. <br />Street and Building Access: The site will derive access from a private drive shared by Lots 3, 4 and 5 of <br />COR TWO. Cross access agreements must be recorded against each lot. <br />
The URL can be used to link to this page
Your browser does not support the video tag.