My WebLink
|
Help
|
About
|
Sign Out
Home
Minutes - Council Work Session - 10/23/2012
Ramsey
>
Public
>
Minutes
>
Council Work Session
>
2012
>
Minutes - Council Work Session - 10/23/2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 12:37:37 PM
Creation date
1/3/2013 10:01:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Meeting Type
Council Work Session
Document Date
10/23/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Councilmember McGlone asked if City engineering staff missed the drain field so now the <br />Council has to consider a change order. <br />Interim Engineer Nelson stated there are other drainage issues on the Billmark Electric property. <br />He presented an overview of issues relating to the Sunwood Drive project: a trail conflicts near <br />Round Lake Boulevard; installation of the signal cabinets, trail bid at 8 -foot width when Code <br />requires 10 -foot width; utility conflict with the signal base; Connexus transformer; discrepancies <br />between COR TWO retail plans of Landform versus WSB plans; irrigation box is damaged; <br />storm sewer was stubbed to the north side of Sunwood and located within a building site; <br />existing utilities conflicting with road realignment and need to be relocated; ownership of the <br />street lights; crosswalk location; storm sewer pipe was stubbed for future development that was <br />not needed; signage for COR TWO retail area conflicts; Connexus transformer locations; <br />proposed route for Connexus to install cables to serve properties but the COR TWO plat has not <br />yet been recorded; and issues with easements for utility companies. <br />Mayor Ramsey asked who paid to take down and reinstall a fence. <br />Interim Engineer Nelson indicated there have been no additional charges itemized for that work. <br />2.02: Sunwood Drive Project — Consider Change Order #4 <br />Interim Engineer Nelson reviewed the staff report and presented Change Order #4. <br />Mayor Ramsey asked whether WSB should have known about the drain field location. <br />Interim Engineer Nelson stated he does not think so unless WSB had knowledge of the City's <br />records for review. He explained there were no pipes showing the location of a drain field. <br />However, the City did take easements and between the City and WSB, the drain field could have <br />been caught in the design but it was not. <br />Mayor Ramsey asked if the City is expected to "eat" this cost because someone neglected to <br />check this. <br />Interim Engineer Nelson answered in the affirmative. <br />Councilmember Wise stated he does not want the City to pay for it if it is not the City's fault. He <br />noted this project has budget overruns and this is the County's part of the project so it should be <br />on WSB, not at the City's expense. <br />Development Services Manager Gladhill indicated WSB requested records on what parcels had <br />septic systems and he would have to research whether there are missing records where it was not <br />filed with the City. <br />City Administrator Ulrich asked whether the City has the ability to retain fees from WSB at a <br />certain point. <br />City Council Work Session / October 23, 2012 <br />Page 5of11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.