Laserfiche WebLink
investment in infrastructure to construct the ultimate system. In the future, upon construction <br />of the ultimate lift station near the intersection of Armstrong Boulevard and 142 Avenue NW <br />and easterly sewer extension on 142 Avenue, the temporary private lift station could be <br />abandoned or removed, thus eliminating its operating and maintenance costs. <br />The total estimated cost for the sanitary sewer extension is $202,510. <br />T '? <br />R <br />ti <br />CONCEPTUAL <br />PRIVATE <br />EORCEMAI N <br />CONCEPTUAL <br />PRIVATE LIFT <br />STATION <br />Figure 7. Proposed Sanitary Sewer improvements. <br />Storm Water Management <br />Storm water will be collected off the street and boulevards by curb and gutter and storm sewer. <br />The large storm water pond on the south side of Highway 10 will be significantly impacted. It <br />will be necessary to obtain drainage and utility easement rights to mitigate the impacted storm <br />water pond, as well as to provide treatment for the new segment of road. <br />61 Page <br />