My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 01/08/2013
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2013
>
Agenda - Council Work Session - 01/08/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:03:00 AM
Creation date
1/10/2013 1:37:51 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
01/08/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
unit price basis and the contractor will only be paid for work completed. No costs are included <br />for easements or wetland mitigation / permitting. <br />Detailed cost estimates for the sanitary sewer and water extensions have been completed in <br />conjunction with this report. The estimates include construction, a 10% allowance for <br />contingency. A summary of the cost estimate for the entire project is presented in Table 1. <br />Table 1. Estimate of Probable Cost <br />Summary - Estimate of Probable Cost <br />Item Estimated Total Costs <br />Road Construction $2,168,000.00 <br />Watermain $521,000.00 <br />Sanitary Sewer $202,500.00 <br />Total $2,891,500.00 <br />Financing <br />The City received a Cooperative Agreement grant in the amount of $702,000 which will partially <br />fund the road construction and associated drainage improvements. The remaining of the road, <br />associated drainage improvements, and bituminous sidewalk will be funded by the City's <br />Municipal State Aid (MSA) account. <br />The costs for extending the sanitary sewer and water main will be funded in the near term by <br />the sewer and water enterprise funds, with those funds being paid pack over time through the <br />collection of connection charges and /or assessments. <br />A summary of the funding is as follows: <br />Table 2. Financing Summary. <br />81 Page <br />inancing Summary <br />Description <br />Amount <br />Cooperative Agreement Grant <br />$702,000 <br />MSA Fund <br />$1,466,000 <br />Sewer Enterprise Fund <br />$202,500 <br />Water Enterprise Fund <br />$521,000 <br />Total <br />$2,891,500 <br />unit price basis and the contractor will only be paid for work completed. No costs are included <br />for easements or wetland mitigation / permitting. <br />Detailed cost estimates for the sanitary sewer and water extensions have been completed in <br />conjunction with this report. The estimates include construction, a 10% allowance for <br />contingency. A summary of the cost estimate for the entire project is presented in Table 1. <br />Table 1. Estimate of Probable Cost <br />Summary - Estimate of Probable Cost <br />Item Estimated Total Costs <br />Road Construction $2,168,000.00 <br />Watermain $521,000.00 <br />Sanitary Sewer $202,500.00 <br />Total $2,891,500.00 <br />Financing <br />The City received a Cooperative Agreement grant in the amount of $702,000 which will partially <br />fund the road construction and associated drainage improvements. The remaining of the road, <br />associated drainage improvements, and bituminous sidewalk will be funded by the City's <br />Municipal State Aid (MSA) account. <br />The costs for extending the sanitary sewer and water main will be funded in the near term by <br />the sewer and water enterprise funds, with those funds being paid pack over time through the <br />collection of connection charges and /or assessments. <br />A summary of the funding is as follows: <br />Table 2. Financing Summary. <br />81 Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.