Laserfiche WebLink
V z <br />lT H H <br />a Dp <br />U <br />Z <br />0 <br />U <br />U W <br />WORK BREAKDOWN STRUCTURE <br />O <br />CITY OF RAMSEY <br />PROJECT: RIVERDALE DRIVE EXTENSION, CITY PROJECT 12-22 <br />ESTIMATED PERSON HOURS <br />w <br />W <br />Z_ W <br />H <br />Z <br />W <br />W <br />0 H <br />ULL <br />< <br />0 <br />ce <br />Lu W <br />Z 7, Q <br />o—Oz <br />Z a 2 <br />w <br />WORK TASK DESCRIPTION <br />0 <br />Z <br />a <br />(fl <br />0 0 <br />O o <br />1 <br />lO LO <br />0 <br />m 0 0 <br />N N (�O <br />ER N <br />ER <br />O <br />O <br />CO CO <br />O <br />O <br />0 <br />0 <br />N- o In <br />N a) o) U7 N- <br />GO l00 LOGO <br />0) 0) <br />N lO lf) <br />M 0 0 <br />O <br />O <br />co <br />ER <br />O <br />O <br />N <br />O <br />0 <br />0 <br />In In m <br />CO <br />N O (fl (..0(fl lf) OM <br />M CO CO O <br />O <br />3 O <br />CO COO 0 <br />V V CO 10 LO 0 W <br />e» v <br />O <br />O <br />ER <br />5 - Nov 25; 6 weeks <br />U N <br />p o) a <br />t CO <br />0 — Q <br />c <br />O m 2 <br />N N <br />< <br />c <br />in 0 a <br />c <br />O ro U o <br />) vo <br />O 0 <br />N <br />a 0 a <br />Project Close Out <br />Q. N <br />SUBTOTAL - TASK 6 <br />SUBTOTAL OF TASKS 1-6 <br />TOTAL ESTIMATED PERSON HOURS <br />AVERAGE HOURLY BILLING RATES <br />0 <br />va <br />ESTIMATED VALUE <br />TOTAL ESTIMATED COST <br />$2,948,000.00 <br />TOTAL ESTIMATED PROJECT COST <br />$150,000.00 <br />TOTAL ESTIMATED ROW COSTS <br />O <br />O <br />O <br />N <br />0) <br />O <br />eft <br />TOTAL ESTIMATED ENGINEERING & ADMINISTRATIVE COSTS <br />$2,400,793.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />ENGINEERING & ADMINISTRATIVE (% OF CONSTRUCTION) <br />Riverdale Drive Work Hour Estimate <br />