My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/31/2013 - Special
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 01/31/2013 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:17:22 AM
Creation date
1/25/2013 4:29:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special
Document Date
01/31/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />01/25/13 <br />PROJECT ADDRESS <br />TBD - MULTIPLE <br />PROJECT. TITLE <br />THE SEASONS OF RAMSEY <br />ESCROW # <br />113355 <br />DEPARTMENT: <br />Engineering <br />TECHNICAL REVIEWER: <br />Name: Shane Nelson / Leonard Linton <br />Phone: 763 433-9825/ 433-9834 <br />Email: haengineering@ci.ramsey.mn.us/ llinton@ci.ramsey.mn.us <br />Plans Reviewed: Final Utility & Street Construction Plan prepared by Pioneer Engineering dated 1-18- <br />13 consisting of 5 pages and Preliminary Construction Plans prepared by D'Heilly Engineering, Inc. <br />dated 12-29-12 consisting of 7 pages. <br />We offer the following comments regarding the submitted plans: <br />PRELIMINARY CONSTRUCTION PLANS — D'Heilly Engineering <br />Removal Plan: This project proposes removing existing pavement between 147th Circle and 147th Lane <br />NW. Removal of existing utilities is also proposed. A removal plan for this work must be prepared and <br />submitted. <br />Grading and Drainage: The grading plan generally conforms to City Standards. Areas that need revision <br />are noted below: <br />• The 4 plex immediately west of 147th Circle is less than 1 foot above the high point for the <br />emergency overflow route from the oval driveway. The lowest building elevation must be at least <br />1 foot above the emergency overflow elevation. <br />• Several of the buildings adjacent to the infiltration area are less than 1 foot above the adjacent <br />high point between catch basins. Minimum separation of 1 foot must be provided as noted above. <br />• The infiltration area currently is covered by a berm constructed as part of the previous <br />development. Infiltration is generally not recommended where soils have been impacted by <br />construction. Documentation must be provided indicating the soils under the infiltration practice <br />can provide the required infiltration capacity for the project. <br />• These plans show catch basins in 147th Lane NW while the Pioneer Engineering plans do not. <br />• The plans call for 18" and 24" perforated pipe in the infiltration area. This must be coordinated <br />with the stormwater model. <br />The stormwater calculations for the project must be revised as follows: <br />• Provide calculations for the 10 and 100 year events for the oval driveway area and the infiltration <br />area. The maximum water depth at the high points between catch basins must be provided. <br />This project has received a permit from the Lower Rum River Water Management Organization <br />(LRRWMO). The permit has 6 conditions that must be followed during construction of this project: <br />1. Erosion control measures shall be installed prior to commencement of construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.