My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 01/31/2013 - Special
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2013
>
Agenda - Planning Commission - 01/31/2013 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:17:22 AM
Creation date
1/25/2013 4:29:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Title
Special
Document Date
01/31/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
193
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Seasons of Ramsey <br />Final Utility/ Preliminary Construction Plan Review <br />January 23, 2013 <br />Page 2 of 4 <br />2. Upon completion of construction and restoration of disturbed areas, the permit applicant is <br />responsible for the removal of all erosion control measures installed throughout the construction <br />site. <br />3. Street sweeping must be undertaken and completed on an as needed basis. <br />4. Compliance with the stormwater management requirements of the Lower Rum River Watershed <br />Management Organization are to be administered for this project by the City of Ramsey. <br />5. Information must be submitted to the LRRWMO showing that a minimum of 3 feet of separation <br />is provided between the bottom of the proposed infiltration/ rainwater basin and on -site <br />groundwater. <br />6. In all cases where the doing by the permittee of anything authorized by this permit shall involve <br />the taking, using, or damaging of any property, rights or interests of any other person or persons, <br />or of any publicly owned lands or improvements or interests, the permittee before proceeding <br />shall obtain the written consent of all persons, agencies, or authorities concerned and shall acquire <br />all necessary property rights and interest. <br />The following notes must be added or amended on the plan set: <br />• The contractor shall have a sweeper on site or available within 3 hours. All material tracked onto <br />City streets must be removed immediately upon discovery, or as directed by the City Engineer. <br />• Installation of silt fence and other down gradient sediment protection measures shall be <br />completed and inspected by City prior to commencement of any site activities. <br />Street and Building Access: The plan proposes extension of 147th Lane NW west to connect with Town <br />Center Drive. This street will be public and must be constructed to City Standards. Sidewalks will be <br />required on both sides of the street The private drive west of the private road must be able to <br />accommodate fire truck access. Our standard is a minimum radius of 30 feet on all inside curves along <br />the access route. <br />• Any impacts to City streets (wet tap and curb cut locations) should be brought to grade with class <br />5 by the end of the work day and paved within 24 hours. <br />A pavement/ site plan must be provided showing pavement dimensions and sections. <br />Utilities: <br />• The watermain in the oval driveway area must be connected to 147th Lane to provide a loop. <br />• Sanitary sewer manholes along the south side of the oval driveway shall be moved into the paved <br />area. <br />• All ductile iron watermain 6" in diameter and smaller requires class 53 material. <br />• The sewer and water north of the private road must be removed to allow construction of the <br />proposed buildings. The mains must be removed back to the Tee or Manhole and capped <br />securely. <br />• Water services shall be abandoned by digging down and removing the service riser and capping <br />the stub. <br />• Sanitary sewer services shall be abandoned by digging down and gluing a cap on the pipe to <br />remain. <br />• All removal work shall be shown on the removal plan. <br />• Clear differentiation must be provided to identify services to remain vs. new service installations. <br />• All hydrants must be hand painted. <br />
The URL can be used to link to this page
Your browser does not support the video tag.