My WebLink
|
Help
|
About
|
Sign Out
Home
10/16/90 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1990's
>
1990
>
10/16/90 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 9:06:49 AM
Creation date
11/13/2003 11:59:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission - Special
Document Date
10/16/1990
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
monitoring shall include the following State and Federal <br />criteria pollutant emissions as may exist from time to time <br />during the term of this permit. The cost of such testing and <br />reports shall be borne by the Permit Holder. <br /> <br />OUTLINE OF REVISED MONITORING PROGRAM <br /> <br />Sample Type <br /> <br />Parameter <br /> <br />Frequency* <br /> <br />Stack Emissions Particulates, opacity, <br /> VOC's <br /> <br />Annually (3 samples <br />minimum per event) <br /> <br />Feed Material <br /> <br />RCRA Characteristics <br />(EP Toxic) <br /> <br />Annually <br /> <br />Ash Material <br /> <br />RCRA Characteristics <br />(EP Toxic) <br /> <br />Annually (3 samples <br />minimum per event) <br /> <br />*Assumes no significant change in wastes to be incinerated. <br /> <br />The City and the Permit Holder may mutually agree to revise <br />the monitoring program from time to time. Such revisions <br />shall be authorized in accordance with Condition 35 herein. <br /> <br />Emergency Emissions Testing <br /> <br />~f, in the opinion of the City Administrator or his authorized <br />representative, it is determined to conduct .pollution tests <br />during an officially reported incident, the City.may contra~t <br />With an independent testing, laboratory who shall be permitte~ <br />access to the facility to conduct tests as may be prescribe~ <br />kY the City and to evalute conditions of the facility. The <br />cost of such evaluation testing and reports shall be borne by <br />the permit holder and payment for such costs will be due <br />within 30 days of the invoice date. <br /> <br />Corrective Actions <br /> <br />The City. may order the permit holder to undertake corrective <br />actions within specific timeframes based on test results or <br />evalutions to remedy pollution problems or nuisance com- <br />plaints. If the permit holder fails to take corrective action <br />within specified time frames, it may be determined by the City <br />Council to be a violation of the CUP and cause for permit <br /> <br />revocation. <br /> <br />Dissassembly of Engines, Transmissions, Other Feedstock. <br />Dissassembly of engines, tranmissions and other feedstock <br />shall not be permitted on the Site under this Conditional Use <br />Permit. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.