Laserfiche WebLink
17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />Ash Disposal. Prior to the date this permit becomes <br />effective, Permit Holder shall submit a copy of the written <br />agreement or certification from the designated ash processing <br />and/or disposal facility that said facility is willing to <br />accept the ash. The Permit Holder shall notify the City of <br />any change in ash processing/disposal facilities within 30 <br />days of such change. <br /> <br />Wire processinq. The Permit Holder shall not process wire by <br />melt operations on the Site. <br /> <br />CoDtro~ of Operations. Ail hauling, processing, separating, <br />disposal and other activities incidental to the recycling and <br />aluminum processing operation shall be conducted in confor- <br />mance with state and federal regulations and in accordance <br />with the applicable requirements of the Performance Standards <br />of the City Code (Section 170.017). Operations must be <br />conducted so as to minimize noise, safety, smoke or other <br />nuisance concerns to adjacent properties. <br /> <br />Pest Control. Insects and rodents on the site shall be <br />controlled and exterminated as needed and additional control <br />may be directed by the City Inspector subject to all <br />applicable laws, rules and regulations. <br /> <br />Litter Control. The Permit Holder shall be responsible for <br />removing debris caused by vehicles using the aluminum <br />processing/recycling facility. Debris removal activities <br />shall be instituted promptly following information of such <br />accumulation. In the event the Permit Holder fails to remove <br />debris within 24 hours of notice of accumulation by the City, <br />the City may cause such debris to be removed. The City shall <br />bill the cost of such removal to the Permit Holder and payment <br />shall be remitted within 30 days of the date of such billing. <br />Visual checks for debris accumulation shall be made at least <br />once daily by employees of the Permit Holder. <br /> <br />Aluminum Processinq E~uipment. Ail equipment and vehicles <br />utilized in the conduct of business at Aluminum Recycling, <br />Inc. shall be periodically inspected and maintained to <br />minimize noise, odors, safety and fire safety concerns and to <br />assure optimum pollution control. <br /> <br /> <br />