My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/26/2013
Ramsey
>
Public
>
Agendas
>
Council
>
2013
>
Agenda - Council - 03/26/2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 9:11:53 AM
Creation date
3/28/2013 10:18:52 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/26/2013
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
554
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 4. 1. <br />Meeting Date: 03/26/2013 <br />By: Tim Gladhill, Community Development <br />Information <br />Title: <br />Consider Revised Development Agreement and Development Permit for NORTHGATE ADDITION located at <br />7295 Sunwood Drive NW; Case of Northgate Church, Inc. <br />Background: <br />On October 23, 2012, the City Council granted approval to the Northgate Performing Arts Center. The proposed <br />development consists of a single -structure auditorium/church. The original Applicant for the Plat (subdivision of <br />property) was PSD, LLC. PSD was owner of fee -title at the time of Application, but has since conveyed the <br />Property to Northgate Church, Inc. <br />The request for a revised Development Agreement is two -fold: <br />1. Reflect the current Property Owner and Assign the Agreement to Northgate Church, Inc. <br />2. Approve the required Financial Surety amount <br />Included in the approval was the required Development Agreement, that among other items, includes required <br />improvements and financial sureties to ensure the timely installation of said required improvements. City Code <br />requires a financial surety in the amount of 125%of the cost of the required improvements for public improvements <br />(Plat/subdivision) and 150% for private improvements (site plan). <br />The Developer has submitted estimated costs of said required improvements, partially backed by bids and unit <br />prices. The Developer has estimated that their obligation for a financial surety should be in the amount of <br />approximately $117,000. The City's Engineer's Estimate is approximately $166,000. It should be noted, in this <br />instance, that a majority of the required public infrastructure has already been installed (Sunwood Drive and Peridot <br />Street). The remaining obligations are mainly private improvements such as parking lot and landscaping. <br />Notification: <br />No notification required. <br />Observations/Alternatives: <br />The financial surety is a requirement to protect the City from liability from uncompleted improvements. This is <br />especially important when it comes to Developer installed public improvements such as sanitary sewer, water, <br />stormwater, and streets. <br />The City Council has approved multiple instances in the past of accepting a letter of credit for a partial amount, and <br />requiring as part of the Development Agreement that the Developer agrees that a Certificate of Occupancy will not <br />be issued until the required improvements are complete, unless an adequate surety exists or is posted at that time. <br />In the event of default of the project after it commences, the likely City response would be as follows: <br />1. Repair and/or complete any erosion control measures as required by City Code, Lower Rum River Watershed <br />Management Organization, and the Minnesota Pollution Control Agency (the City is responsible for <br />enforcing these regulations and is subject to fines and/or postponement of development projects) <br />2. Inspect and repair as needed any connections to the municipal water, sanitary sewer, and stormwater systems <br />3. Remove any blight conditions <br />The Developer has requested that the required surety amount be at a level of 100% of the required improvements, as <br />opposed to the indicated 125% or 150%. <br />
The URL can be used to link to this page
Your browser does not support the video tag.