My WebLink
|
Help
|
About
|
Sign Out
Home
03/07/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
03/07/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:52:33 AM
Creation date
11/14/2003 11:22:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
03/07/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9) Describe the security control measures: <br /> <br />The landfill site which includes the tire processing <br />facility is completely fenced with a locking gate. The <br />gate is open only during operating hours. The scale at the <br />entrance to the tire processing facility is continually <br />monitored during operating hours.Security cameras at the <br />landfill office continuously monitor all traffic travelling <br />on the site entrance road. All major equipment on site are <br />equipped with two way radios allowing communication with <br />the landfill office at all times. A two way radio will be <br />located at the tire processing facility as well. <br /> <br />In addition the tire processing area will also be <br />com~letely fenced with a locking gate. These measures will <br />elis~inate unauthorized tire dumping and discourage would-be <br />van~als. <br /> <br />Describa the relationship of the facility to the applicable <br />couDty solid waste management plan, and the area to be <br />served by the facility: <br /> <br />The proposed tire processing facility will serve the Twin <br />CitLes and surrounding areas. <br /> <br />The facility is consistent with the Anoka County Solid <br />Wazte ~anagement Pla~]. The proposed facility has adequate <br />cspac~.uy to process all waste tires generated in the <br />co::nty. Applicable portions of the plan are included in <br />At.tachment No. 2. <br /> <br />Wh~t is the expected operating life of the facility, and <br />how was this number calculated? <br /> <br />Providing a viable market for the tire derived product <br />cor~tinues to be available, the proposed processing facility <br />will continue to operate for an indefinite period of time. <br /> <br />88W5-15 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.