My WebLink
|
Help
|
About
|
Sign Out
Home
03/07/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
03/07/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:52:33 AM
Creation date
11/14/2003 11:22:17 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
03/07/1989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
21. That other industries in the City are generally located within <br /> buildings and therefore have state building code mandated fire <br /> protection requirements, that the proposed use will not be <br /> sheltered by a building and, therefore, special fire protection <br /> may be needed. <br /> <br />22. That the city of Ramsey currently does not have an operational <br /> fire department and, therefore, contracts with the City of Anoka <br /> for fire protection in that area of the city where the proposed <br /> use is located. <br /> <br />23. That the metal wheels extracted prior to the time office <br /> processing will be placed in roll-off boxes stored on site for <br /> later transportation to scrap metal dealers. <br /> <br />24. That waste tires will be received from both individuals and <br /> commercial haulers. <br /> <br />25. Tht the following documents from %~MI's "Waste Tire Facility <br /> Permit Application" to the PCA are attached hereto cumulatively as <br /> E×hibit "C" and incorporated herein as it fully set forth at this <br /> point, to wit: <br /> <br />a. Section II. Facility Operation consisting of four (4) pages. <br />b. Section IV. Closure plan consisting of three (3) pages. <br />c. Se~tion VII. Additional information for waste tire processing <br /> facilities consisting of one (1) page. <br />d. Section X. Emergency Preparedness Manual. <br /> <br />That a certain amount of dust will be created as a result of the <br />shredding operation. <br /> <br />27° That a certain amount of dust will be created by vehicular traffic <br /> into and out of the site. <br /> <br />25° That cutside tire storage has the potential for being a source for <br /> mosquito breeding. <br /> <br />29° That ~q~MI has stated the maximum number of tires on ~he site at <br /> any one time will be 70,000 which is the maximum number permitted <br /> under WMMI's proposed PCA permit. <br /> <br />30° That the actual tire processor is a mobile tire shredder located <br /> entirely on a flat bed trailer, which trailer will be moved from <br /> the site periodically in order to process tires in other <br /> communities. <br /> <br />31o That WMMI proposes no permanent improvements or structures on the <br /> site, such as storage buildings, etc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.