My WebLink
|
Help
|
About
|
Sign Out
Home
04/04/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
04/04/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:52:44 AM
Creation date
11/14/2003 11:55:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission
Document Date
04/04/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Description of Request - The applicant requests that the site be <br />used for an aluminum processing plant as described in the following <br />operational plan. <br /> <br />OPERATIONAL PLAN <br /> <br />The applicant is requesting a permit to install the equipment <br />necessary to process aluminum. The Geed stock will be brought to <br />the plant in semi-trucks and delivered to one end o£ the building. <br />That feed stock includes scrap from industrial locations, aluminum <br />pickings from landfills, and the aluminum partm from automobile <br />transmissions and engines. <br /> <br />The feed stock is then transferred to the melt furnace, which melts <br />off the aluminum separating it ~rom other metal components. The <br />aluminum is then poured into casting machines ~or manu£actured parts <br />on a subcontract basis, or into thousand pound ingots. Those <br />manufactured parts and ingots are then moved to the storage area for <br />cooling. After cooling they will be shipped out o£ the plant in <br />semi-trucks. <br /> <br />The res/due ~rom the furnace that has not been melted off is then <br />run through an electro magnetic crane where the steel and iron is <br />separated. The remaining residue will then be put through a <br />separator, conveyed on an enclosed conveyer to a cement block <br />storage building approximately lC' X 20'. The remainder will be <br />shipped o£f site ~or further processing. <br /> <br />The equipment to be used in the building includes forklifts, and a <br />melt furnace. The structure of that melt furnace and the air <br />emision control equipment is explained in the engineer's report <br />attached to this permit request. <br /> <br />The equipment to be used outside is the electro-magnetic crane. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.