Laserfiche WebLink
6. Present Zoning Dlmtrict - <br />industrial zone. <br /> <br />The buildin9 ia located in an <br /> <br />7. Site Plan - A mite plan showing <br />structures ts attached. <br /> <br />the required items and <br /> <br />8. Drainage Plan - The building ia located on a fairly level site. <br />Drainage ia now away from the building. Additional drainage will be <br />included in the layout of the hard surfacing to be completed for the <br />driveways and the parking areas on the site. Those water drainage <br />directions are included on the mite plan. <br /> <br />9. Access to Site - Access to the site ia available ~rom Sunfish <br />Lake Road and then'along s/de streets. All of the trucks will be <br />moving through industrial sections only. <br /> <br />lO. Garbage Container Location - The garbage container will be <br />located within the sheltered area on the mouth end of' the building. <br /> <br />11. Description of construction and proposed mater/als - It is not <br />anticipated that any construction will be done on the building other <br />than as outlined under "Improvements at the Site." <br /> <br />12. Ef£ect o~ proposal on traffic in area - It is anticipated that <br />when the plant is fully operational there will be a total of six <br />trucks visiting the site during a business day. The only other <br />traffic to the site will be the employee traffic. There will be a <br />total of twelve to fifteen employees when the plant is fully <br />operational. There are adequate parking mites for each of the <br />employees on the property. There will be no retail traffic to this <br />site. Also, there will be very little supplier or salesperson <br />traffic at this site. <br /> <br />Io5- <br /> <br /> <br />