My WebLink
|
Help
|
About
|
Sign Out
Home
04/18/89 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Planning and Zoning
>
Agendas
>
1980's
>
1989
>
04/18/89 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2025 8:53:06 AM
Creation date
11/14/2003 12:07:55 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Planning and Zoning Commission - Special
Document Date
04/18/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
scenic easement dedication may be in lieu of up to 25% <br />of the requirements in Sections 170.062 and 170.063 <br />above. <br /> <br />D. Totlots & Playgrounds <br /> <br />The city, upon review, may determine that the subdivider <br />shall create and maintain some form of on-site recreation <br />use by the site residents such as tot lots and open play <br />space. <br /> <br />That where such credit is granted, the amount of credit <br />shall not exceed twelve percent (12%) of the amount which <br />otherwise would be required for parkland dedication. <br /> <br />E. Trails <br /> <br />Refer to 170'.070, Required Improvements. <br /> <br />In no event shall the amount of credits earned against park <br />dedication requirements exceed 50% of that which otherwise <br />would be required for parkland dedication. <br /> <br />170.069 REQUIRED IMPROVEMENTS <br /> <br />Subdividers shall be responsible for making certain <br />improvements to the parkland they dedicate within their <br />development for park, playground and public open space <br />purposes as follows: <br /> <br />Provide finish grading and ground cover for all <br />park, playground, trail and public open spaces and <br />provide landscape screening in accordance with City <br />Policy. <br /> <br />Complete, construct and pave all trails which are <br />identified in the City's Trail Corridor Plan in <br />accordance with City Standards concurrently with the <br />roads in their developments (i.e., grading with site <br />grading and paving with street or parking lot <br />paving). Park dedication credit will be given for <br />right-of-way connecting these trails to existing or <br />proposed trails identified in the City's Trail <br />Corridor Plan A~--~d~t ~ ..... -~-'~ ~ 25~ cf thc -c~'~-~d <br />a ~-c ....... =Ccunoil for <br /> <br />~_~ .......... as well as for construction of the <br />trail(s) and associated improvements. <br /> <br />Complete, construct, and pave walkways which may be <br />required as a trail link connector in accordance <br />with City Standards. Such trails may be within <br /> <br />7 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.